- Surface area
- 5,400 m²
- Year
- 2024
Bridge girders
36 girders for a canal crossing, metallized and topcoated for more than 25 years without major maintenance.
- Construction
- Blasting
- Metallizing
- Industrial coating
- Temse

14,800 m² of structural steel given 60 minutes of fire resistance in our hall, before it reached the site.
A new hospital wing was built around an exposed steel frame, with 60 minutes of fire resistance required on every column and beam. Spraying intumescent on site would have put a wet, weather-dependent trade on the critical path, right where the façade and building services teams needed to start.
We took over the fire protection from the fabricator’s yard. The fire engineer’s schedule listed more than 900 members, each with a thickness based on its section factor. We loaded that list into our planning, so every beam left the hall labelled with its measured thickness. Cellular beams got extra attention around the openings, where steel heats up faster. Deliveries followed the erection sequence floor by floor, so nothing sat waiting on site.
The frame went up without fire-protection scaffolding or curing time on site. Only the bolted connections needed touch-up after erection, which our team handled in two short site visits.
Gallery


Related projects

36 girders for a canal crossing, metallized and topcoated for more than 25 years without major maintenance.

An open car park on six levels, with R60 intumescent and an anthracite finish applied in our hall.

Our team handles the work. You get the results. Let's talk.