
- Surface area
- 1,850 m²
- Year
- 2025
Refinery fire protection
Epoxy intumescent on column skirts and support steel, rated for 90 minutes of hydrocarbon fire.
- Petrochemistry
- Blasting
- Fire coating
- Lokeren

Track record
Proven industrial solutions across sectors. Filter by sector to find the projects closest to yours.
Portfolio
Each project demonstrates our capacity and precision in action

Epoxy intumescent on column skirts and support steel, rated for 90 minutes of hydrocarbon fire.

36 girders for a canal crossing, metallized and topcoated for more than 25 years without major maintenance.

An 80-tonne boom metallized and coated for a life in salt spray and abrasive bulk dust.

14,800 m² of structural steel given 60 minutes of fire resistance in our hall, before it reached the site.

New shell courses and roof plates for two 20,000 m³ tanks, lined inside and coated outside before erection.

Boat landings, platforms and ladders for offshore wind foundations, protected with thermal-sprayed aluminium.

Our team handles the work. You get the results. Let's talk.