Storage tank refurbishment
New shell courses and roof plates for two 20,000 m³ tanks, lined inside and coated outside before erection.
- Petrochemistry
- Blasting
- Industrial coating
- Lokeren

Epoxy intumescent on column skirts and support steel, rated for 90 minutes of hydrocarbon fire.
During a planned turnaround, a refinery operator replaced the skirts and support steel under three distillation columns. In a hydrocarbon pool fire, temperatures pass 1,000 °C within minutes, so unprotected steel loses its strength long before a fire can be brought under control. The new steel had to arrive on site fully fireproofed, because the shutdown window left no time for spraying inside the unit.
We blasted every part to Sa 2½ and primed it the same day. The epoxy intumescent went on in several passes in our Lokeren hall, with a glass-fibre mesh embedded halfway so the char stays in place when it expands. Thickness was set per part from the fire engineer’s schedule and measured at every location before the topcoat went on. Bolted connections were left bare and shipped with a repair kit for touch-up after assembly.
All 64 parts were delivered in four batches, each on the day the erection crew needed it. The thickness report for every part went into the operator’s integrity file, and the units restarted on schedule.
Gallery



Related projects

New shell courses and roof plates for two 20,000 m³ tanks, lined inside and coated outside before erection.

Modular pipe racks for a chemical plant expansion, coated and fireproofed in four batches.