- Surface area
- 1,850 m²
- Year
- 2025
Refinery fire protection
Epoxy intumescent on column skirts and support steel, rated for 90 minutes of hydrocarbon fire.
- Petrochemistry
- Blasting
- Fire coating
- Lokeren

New shell courses and roof plates for two 20,000 m³ tanks, lined inside and coated outside before erection.
A tank storage terminal rebuilt two 20,000 m³ tanks for a new chemical product, replacing the lower shell courses and the roof plates. The inside needed a chemical-resistant lining and the outside a system that lasts in a port atmosphere. Doing both on site, inside a tank, means scaffolding, forced ventilation and weeks of weather risk.
The fabricator rolled the plates and sent them to Lokeren on transport frames that kept their curvature. We blasted both sides, lined the inside with two coats of novolac epoxy and gave the outside a three-coat system. Weld zones were masked 50 mm wide so the site welders could join the plates cleanly. Every lined plate was spark-tested for pinholes before it left the hall.
Site work came down to welding and coating the seams. Both tanks were back in service three weeks earlier than the original plan with coating on site.
Gallery


Related projects

Epoxy intumescent on column skirts and support steel, rated for 90 minutes of hydrocarbon fire.

Modular pipe racks for a chemical plant expansion, coated and fireproofed in four batches.

Our team handles the work. You get the results. Let's talk.